Notification of Hearings under Rule 13(6) Infrastructure Planning (Examination Procedure) Rules 2010 and sections 91 and 93 of the Planning Act 2008
1. Notice is hereby given that, at the dates, times and locations set out below, the following Hearings will be held by the Examining Authority (on behalf of the Secretary of State for Energy Security and Net Zero (the “Secretary of State”)) for the examination of the application made by East Pye Solar Limited (Company Number 14684189), whose registered office is Unit 25.7 Coda Studios, 189 Munster Road, London, England SW6 6AW (“the Applicant”) for a Development Consent Order (“DCO”) under [section 27 of] the Planning Act 2008 (“the Application”).
2. The Application was submitted to the Secretary of State via the Planning Inspectorate on 5 March 2026 and accepted for examination on 2 April 2026. The reference number applied to the Application by the Planning Inspectorate is EN0110014.
3. The Examining Authority was appointed on 19 June 2026 to examine the Application.
4. An Open Floor Hearing and Issue Specific Hearing will be held at the dates, times and location set out in the table below. The table also provides the date, time and location for the Preliminary Meeting on the Application for information purposes.
Preliminary Meeting Tuesday 15 September 2026 Registration and seating available at venue from: 09:30 Virtual registration Process from: 09:30 Hearing starts: 10:00
Open Floor Hearing 1 (OFH1) Tuesday 15 September 2026
Registration and seating available at venue from: 13:30
Virtual registration process from: 13:30 Hearing starts: 14:00
Open Floor Hearing 2 (OFH2) Wednesday 16 September 2026
Registration and seating available at venue from: 09:30
Virtual registration Process from: 09:30 Hearing starts at 10:00
Issue Specific Hearing 1 (ISH1) on site selection, the scope of the proposed development and the draft Development Consent Order Wednesday 16 September 2026
Registration and seating available at venue from: 13:30
Virtual registration process from: 13:30 Hearing starts: 14:00
Issue Specific Hearing 1 (ISH1) continued on the scope of the proposed development, site selection and the draft Development Consent Order Thursday 17 September 2026
Registration and seating available from: 09:30
Virtual registration from: 09:30 Hearing starts: 10:00
Venue and Joining Details
Dunston Hall Hotel, Ipswich Road, Norwich, NR14 8PQ And by virtual means using Microsoft Teams Full instructions on how to join online or by telephone will be provided in advance to those who have pre-registered
5. Interested Parties wishing to speak at the Hearing(s) listed above should notify the Planning Inspectorate in writing by 1 September 2026 via their project website: https:// national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014
6. If you require assistance with registering your attendance, please contact the Case Team at eastpyesolar@planninginspectorate.gov.uk or by calling 0303 444 5000. The Planning Inspectorate reference for the Application (EN0110014) should be quoted in any correspondence.
7. The Hearings will also be held as virtual events, and it will be possible to join them via any standard internet browser or alternatively by telephone dial-in. Full instructions on how to join online or by telephone will be provided in advance to those who have pre-registered to speak. Live streams will also be provided for each Hearing for those who wish to watch but not speak. The link for this will be available on the day at: https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN0110014
8. Further information regarding the Hearings, the examination of the Application, the full timetable, how and when to register to speak at the Hearings, and how and when to make written submissions will also be available on the project page of the Planning Inspectorate’s website (link above), or by contacting the Planning Inspectorate (details above).
9. Please note that Hearings will be recorded, and the recordings will be published on the project page of the Planning Inspectorate’s website as soon as practicable after each Hearing has taken place.
10. Any further Hearings (if required) will be publicised as required by the Planning Inspectorate and by the Infrastructure Planning (Examination Procedure) Rules 2010.
11. If any Hearing is no longer required then notification that a particular date is no longer required will be published as soon as practicable on the Planning Inspectorate’s project webpage, providing reasonable notice to interested parties of the decision to cancel them.
Summary of the Scheme
12. The Application is for development consent to construct, operate and maintain, and decommission a solar photovoltaic (PV) generating station, with a generating capacity of more than 100MW (AC) and associated infrastructure including a Battery Energy Storage System (BESS), 132kV and 400kV Project Substations, Grid Connection Infrastructure, a New National Grid Substation and other ancillary works such as temporary construction compounds, enclosures and fencing, security, drainage, highways and access works, mitigation and enhancement measures (the “Scheme”). The Scheme is located within the administrative areas of Norfolk County Council and South Norfolk Council and comprises approximately 1,213 hectares (ha) of land located south of Norwich and North of Harleston, with the Scheme concentrated east of Long Stratton, with an additional cluster of Solar PV electricity generating stations located south of Great Moulton. The Scheme is near to the villages of Pulham Market, Hempnall, Tasburgh, Silver Green, Saxlingham Nethergate, Woodton, Brooke and Seething. A map showing the location of the Scheme can be viewed on the Planning Inspectorate’s National Infrastructure Planning website at the following link:
13. Development consent is required to the extent that development is or forms part of a Nationally Significant Infrastructure Project (NSIP) pursuant to sections 14(1)(a), 15(1) and 15(2) of the Planning Act 2008. It is for this reason that the Scheme falls within the remit of the Secretary of State’s decision making powers.
14. The DCO, if granted, would authorise the compulsory acquisition of land, interests in land and rights over land, and the powers to use land permanently and temporarily. The DCO would also authorise alterations to the layout of streets, the construction of accesses to the Scheme, the temporary stopping up or management of the public rights of way, street works, removal of hedgerows and the application and disapplication of legislation.
Application form and accompanying documents
15. The Application documents (including maps and plans, the Environmental Statement and the draft Order (the “Application Documents”)), can be viewed and downloaded free of charge in the Documents section on the project page of the Planning Inspectorate’s website:
16. An electronic copy of the Application Documents can be supplied free of charge on a USB memory stick. To request a USB, please email info@eastpyesolar.co.uk, write to FREEPOST EAST PYE SOLAR (free of charge; no need for a stamp) or telephone 0808 281 3175 (free of charge).
17. The following public locations have public internet access which can be used to access the Application Documents electronically via the Planning Inspectorate’s website:
Long Stratton Library
The Street
Long Stratton
NR15 2XJ
T: 01508 530797
Mon: 11:00 to 19:00 (staffed)
Tues: 13:00 to 19:00 (staffed)
Weds: unstaffed
Thurs: 13:00 to 19:00 (staffed)
Fri: 08:00 to 19:00 (staffed)
Sat: 11:00 to 16:00 (staffed)
Sun: unstaffed
Loddon Library
31 Church Plain
Loddon
NR14 6EX
T: 01508 520678
Mon: 10:00 to 19:00 (staffed)
Tues and Wed: unstaffed
Thurs and Fri: 10:00 to 19:00 (staffed)
Sat: 13:00 to 16:00 (staffed)
Sun: unstaffed
Poringland Library
Overtons Way
Poringland
Norwich
NR14 7WB
T: 01508 494891
Mon: 14:00 to 19:00 (staffed)
Tues: 10:00 to 19:00 (staffed)
Weds: 10:00 to 19:00 (staffed)
Thurs: unstaffed Fri: 14:00 to 19:00 (staffed)
Sat: 10:00 to 16:00 (staffed)
Sun: unstaffed
Bungay Community Library
Wharton Street
Bungay
NR35 1EL
T: 01986 506060
Mon: 09:00 to 14:30
Tue - Sat: 09:00 to 17:00
Sun: closed
*Opening hours can change, and documents may only be available for viewing on a computer during staffed hours. This table therefore lists staffed opening hours only, when it is possible to request assistance from a member of the library team to provide access to the computer. We recommend contacting the venues prior to visiting to confirm opening hours and document availability.
18. The full suite of Application Documents can be made available in hard copy format on request. Given the size and format of the Application documents, a full suite of documents may cost up to £5,000. For any bespoke document requests, please contact the Applicant using the contact details at the bottom of the notice, who will provide the cost. Copies of individual documents are available on request, and a reasonable copying charge may apply.
19. If you require alternative methods for inspection of the Application Documents (for example in large print, audio or braille formats), please contact the Applicant by telephone 0808 281 3175 or email info@eastpyesolar.co.uk
Contacting the Applicant
20. To contact the Applicant for further information or queries about the Application, please call 0808 281 3175 (free of charge); write to: FREEPOST EAST PYE SOLAR (no stamp or further details required); email: info@eastpyesolar.co.uk or visit www.eastpyesolar.co.uk



Comments